24/7 Emergency Service Available

Cooling Load Case Studies

Read our cooling load case studies for projects that we have recently completed. Feel free to contact us if you have any questions or would like to schedule an appointment.

Berks Technical Institute

In the Berks Technical Institute case study, the Oliver Mechanical team was initially called to assess hail damage on the rooftop units. The evaluation also uncovered significant changes in the building’s cooling needs since the original installation of equipment.

View Case Study